Overhauling trains from the London Underground Network

Page 2 of 2 Previous  1, 2

Go down

Re: Overhauling trains from the London Underground Network

Post by SP1900 on Mon Jan 29, 2018 12:20 pm

You’re right. Thanks for pointing that out I’ll get that done
avatar
SP1900

Posts : 80
Join date : 2017-12-08

Back to top Go down

Re: Overhauling trains from the London Underground Network

Post by Delsin on Mon Jan 29, 2018 3:32 pm

I know, I got a bit tired and it ended up like this Razz I think it won't be very noticeable in game unless you look very close. Thanks for the feedback!
avatar
Delsin

Posts : 74
Join date : 2016-08-20

Back to top Go down

Re: Overhauling trains from the London Underground Network

Post by SP1900 on Mon Jan 29, 2018 4:58 pm

Delsin wrote:I know, I got a bit tired and it ended up like this Razz I think it won't be very noticeable in game unless you look very close. Thanks for the feedback!
Thanks for your help. I’ll finish the shoegear. I don’t need to do much work on them
avatar
SP1900

Posts : 80
Join date : 2017-12-08

Back to top Go down

Re: Overhauling trains from the London Underground Network

Post by ap1991 on Thu Feb 22, 2018 9:44 pm

If you've used the cylinder command for the wheels, I'd add an extra few faces to them to make them look more, well, wheel shaped.

I know in the early days of BVE using the cylinder/cube command was frowned upon, but we're in 2018 now.

Looking good though.
avatar
ap1991

Posts : 117
Join date : 2014-07-25
Age : 26
Location : Warwickshire

Back to top Go down

Re: Overhauling trains from the London Underground Network

Post by Quork on Thu Feb 22, 2018 9:49 pm

What for? Unless someone is going to make an inspection pit simulation out of OpenBVE, the curvyness is absolutely enough. Remember bogies are deep under the train, virtually invisible from cab view (which, after all, still is the main perspective) and more or less never seen from up close.
avatar
Quork

Posts : 1151
Join date : 2012-05-05
Age : 26
Location : Hofheim a.T., Hessen (Hesse), European Union

Back to top Go down

Re: Overhauling trains from the London Underground Network

Post by graymac on Thu Feb 22, 2018 9:51 pm

and more or less never seen from up close.
Depends on the "viewcam / points of interest" offered by the developer. Though an underground train doesn't get the opportunitiy to flash its bits as much as a surface train, too dark in those tunnels to see a lot.

That cylinder trick is just what I've done with my current project, same as I did with a lot of the road vehicles, not difficult to do.

Code:
[meshbuilder]
cylinder 20,0.39,0.39,0.075
rotate 0,0,1,90
translate -0.82,0.39,1.14
color 140,140,140



avatar
graymac

Posts : 1827
Join date : 2011-08-28
Location : Co Mayo, Eire

http://www.celtictrainsim.com

Back to top Go down

Re: Overhauling trains from the London Underground Network

Post by SP1900 on Thu Feb 22, 2018 10:00 pm

I’m still getting to grips with the coding. But how can I add more faces to a Cylinder?
avatar
SP1900

Posts : 80
Join date : 2017-12-08

Back to top Go down

Re: Overhauling trains from the London Underground Network

Post by ebennekom on Fri Feb 23, 2018 3:04 am

By raising the first argument in the cylinder command.

Consider the front wheel of this vehicle.

6 faced wheel (texture removed)


Code:
cylinder 6, 0.55, 0.55, 0.3






12 faced


Code:
cylinder 12, 0.55, 0.55, 0.3




18 faced


Code:
cylinder 18, 0.55, 0.55, 0.3




ebennekom

Posts : 53
Join date : 2017-12-14
Location : Alicante, Spain

Back to top Go down

Re: Overhauling trains from the London Underground Network

Post by SP1900 on Fri Feb 23, 2018 1:14 pm

Got it. Thanks, will be put into final bogie

Moderative edit: Removed unnecessary full quote.
-Quork
avatar
SP1900

Posts : 80
Join date : 2017-12-08

Back to top Go down

Re: Overhauling trains from the London Underground Network

Post by RR_Nick on Sun Mar 18, 2018 9:35 am

WOW looks really good is there a 2009 stock involved  Question
avatar
RR_Nick

Posts : 3
Join date : 2018-03-18

Back to top Go down

Re: Overhauling trains from the London Underground Network

Post by Stevegr on Sun Mar 18, 2018 8:13 pm

Odd all this,  I been using 20 face cylinder wheels in my stuff for years!

So they can be worth a look if you want to figure something out even if you don't like my one face coding. lol
avatar
Stevegr

Posts : 138
Join date : 2013-01-01
Location : CARDIFF

https://sites.google.com/a/bve4trains.com/bve4trains/

Back to top Go down

Re: Overhauling trains from the London Underground Network

Post by SP1900 on Sun Mar 18, 2018 11:56 pm

RR_Nick wrote:WOW looks really good is there a 2009 stock involved  Question
There might well be. I’ve decided to leave the 1992 and 1995/96 stocks out of it since they are all in development by Ad1992
avatar
SP1900

Posts : 80
Join date : 2017-12-08

Back to top Go down

Re: Overhauling trains from the London Underground Network

Post by SP1900 on Wed Mar 21, 2018 5:50 pm

I found some old pictures of my 1986 stock projects. Due to there being a lack of resources on it I haven’t really had much to work on especially for the red train. If anyone knows any better ways to make the textures photorealistic or help with a little editing of some parts do let me know thanks 
avatar
SP1900

Posts : 80
Join date : 2017-12-08

Back to top Go down

Re: Overhauling trains from the London Underground Network

Post by Quork on Wed Mar 21, 2018 7:52 pm

You might want to check out my "textures from crap" tutorial for some inspiration
avatar
Quork

Posts : 1151
Join date : 2012-05-05
Age : 26
Location : Hofheim a.T., Hessen (Hesse), European Union

Back to top Go down

Re: Overhauling trains from the London Underground Network

Post by SP1900 on Wed Mar 21, 2018 8:32 pm

And where could I find it?
avatar
SP1900

Posts : 80
Join date : 2017-12-08

Back to top Go down

Re: Overhauling trains from the London Underground Network

Post by Quork on Wed Mar 21, 2018 8:57 pm

avatar
Quork

Posts : 1151
Join date : 2012-05-05
Age : 26
Location : Hofheim a.T., Hessen (Hesse), European Union

Back to top Go down

Re: Overhauling trains from the London Underground Network

Post by SP1900 on Wed Apr 11, 2018 4:29 pm

A late update but better late than never I suppose  no I haven’t abandoned the overhaul it’s just taking some time
avatar
SP1900

Posts : 80
Join date : 2017-12-08

Back to top Go down

Re: Overhauling trains from the London Underground Network

Post by Sponsored content


Sponsored content


Back to top Go down

Page 2 of 2 Previous  1, 2

Back to top


 
Permissions in this forum:
You cannot reply to topics in this forum